Services - Construction Administration

Oracle Road Improvement District, Construction Administration Services
Town of Oro Valley
RSE is providing construction administration to complement our recently completed civil design and surveying services for this project that entails roadway widening and intersection improvements. Oracle Road between Pusch View Lane and La Reserve Drive (approximately 0.6 miles) will be widened from a 4-lane to a 6-lane road; First Avenue from Oracle Road to Canada del Oro bridge will be widened from 2-lane configuration to a 4-lane section; and Pusch View Lane from Oracle Road west will be widened from 2 lanes to 4 lanes. Construction cost: $4,500,000.
Roger Road Wastewater Treatment Facility, Phase III, Expansion and Dechlorination, Construction Management Services
Pima County Wastewater Management
RSE provided construction management services this project which entailed: rehabilitation of existing aeration basins; installation of new blowers; rehabilitation of a gravity thickener; construction of a new gravity thickener; installation of a new electric generator and building expansion; upgrade of makeup water station, effluent pump station and process water station; modifications to existing chlorine building; construction of primary clarifiers; provision of fire protection equipment; rehabilitation work to select structures, methane gas piping modification and metering upgrades. Construction cost: $18,280,000.
Ina Road Water Pollution Control Headworks Facility, Construction Management Services
Pima County Wastewater Management
RSE provided construction management services for this new headworks facility, which replaced the existing headworks, involved upgrading the facility from a 25 mgd capacity to 50 mgd. The new facility provides for coarse and fine screening, solids removal, grit removal and odor control, and lifts the influent flow with screw pumps. Construction cost: $18,800,000.
Sweetwater Wetlands Secondary Effluent, 36-inch and 42-inch Reclaimed Main Design and Construction Management
Tucson Water
As a subcontractor to CH2M Hill, RSE provided engineering for the pipeline design, effluent pump station design, subconsultant coordination, and construction management.
RSE provided the final design for 4,800 linear feet of 42" and 36" pipeline and a 40 mgd (ultimate) secondary effluent pump station.
During the construction, RSE provided full-time inspection on-site in support of the resident engineer. RSE was also responsible for shop drawing approvals for pipeline and pump station design components. Construction cost: $2,500,000.
Sahuarita Wastewater Treatment Plant, Construction Inspection Services
Town of Sahuarita
Blackwater Regional Area Park, Construction Management Services
Gila River Indian Community
Arthur Pack Regional Park Improvements Construction Inspection Services
Pima County Natural Resources, Parks & Recreation
Rancho Vistoso 16-inch Alignment Study and Water Main Design Construction Management
Town of Oro Valley Water Utility
Oro Valley Public Library Site Design, Surveying, and Construction Management
Town of Oro Valley
Palisades Wastewater Lagoon, Replacement Design and Construction Management
USDA Forest Service